下面是小编给大家整理的优秀工程专业英文自我评价(共含15篇),欢迎大家借鉴与参考,希望对大家有所帮助。同时,但愿您也能像本文投稿人“hwei”一样,积极向本站投稿分享好文章。
有关工程英文自我评价
First, the construction quality inspection summary
1, XX February 17 to the company after the meeting will be completed in accordance with the requirements of the company to check the Shenzhen Vanke Qian Lin Shanju project, Guangzhou Conghua Xia Wan to take the project to check the project technical documents, construction programs, construction quality, construction safety, The whole construction production system, the inspection of the quality problems, security risks, production points have been made to make a comprehensive reform measures and technical control methods, and check the existence of the sub-project technical information reported to the company.
2, according to the examination of the problems I have done the relevant rectification and technical disclosure, and technical delivery to the foreman under the hands of the Secretary, and cut the requirements of the main management personnel in accordance with relevant technical information to control the implementation of the project quality control in the implementation process Because the management system does not build the leadership does not attach great importance to the quality of the project, not at all levels of implementation, so the implementation of the original grid is not in accordance with the relevant technical specifications data implementation, there is no implementation of the reasons for the analysis;
A, in accordance with the current project construction in the quality, and safety issues to further analyze the quality of the project is the life, an enterprise should be quality first, safety first as the goal. First of all, the company's leadership on the quality of the project has not been a high degree of attention, the company did not develop a clear project quality management objectives, safety management objectives, there is no clear and feasible quality, safety control measures, and no uniform control objectives, A sub-project in the construction process will not be effectively controlled. B, the project quality management is the biggest flaw is not doing a good job targeted technical control of the book, senior management of the sub-project quality management objectives are not clear, security management is not clear, not to mention there are What to guide the effective control of technical documents, volatility and randomness are relatively large, according to the inspection results can reflect the pre-implementation process, sub-project construction is basically based on the discretion of the foreman to command operations, regardless of technical level , Not in accordance with the relevant regulatory requirements to make effective control of the relevant documents.
C, good technical disclosure is one of the conditions to effectively control the quality of the project, to this end, each sub-project should be carried out before the implementation of the end, operating technology, Program, is the process of construction of specific guidance documents, good technical first of all project managers should attach great importance to, and must be clear to the end of the content, including construction methods, quality requirements and acceptance criteria, the construction process should pay attention to issues that may arise Unexpected problems and emergency measures. Key parts, or technical difficulties, the construction of complex sub-projects, do not do a good job at the end of technical sub-project, shall not enter the formal implementation.
Second, the production and quality management overview
1, the construction project is a production of a single, liquidity, large fluctuations, it is not like the general industrial products as the production line so standardized, a fixed production lines, a standardized production technology and improve the detection technology, Of the production equipment and stable production environment, so the project quality is easy to produce fluctuations and fluctuations are still relatively large, while affecting the quality of the project is still more factors, any of which factors change, will make the project quality fluctuations. Such as the use of material specifications varieties of errors, improper construction methods, the operation did not follow procedures, mechanical equipment failure, design errors, the production system construction environment, and so will cause the project quality accident. A major factor is the human factor, according to my company is currently under construction projects, the existence of quality problems, and the vast majority of security risks caused by human factors of quality and safety issues, the total summed up in five , Human factors, material factors, mechanical factors, construction methods, construction environment five factors.
2, personnel factors, people are the main production and operation activities, but also the construction of the project decision-makers, managers, operators, the whole process of project construction, such as project planning, decision-making, surveying, design and construction, To complete. The quality of personnel, that is, people's cultural level, technical level, decision-making ability, management ability, work ability, control ability, physical quality and professional ethics, will directly affect the quality of construction, so the personnel factor is an important impact on project quality factor. Therefore, it is necessary to strengthen the management of their own management quality, improve the quality and safety of management quality, first of all from the leadership to start from the leadership.
工程英文自我评价范文
XX years to participate in the work to XX April has been in Beijing Construction Engineering Construction Engineering Company Limited, a project of any technical work. Mainly to participate in bidding, writing programs and to the end, drawing on-site construction plans, do negotiations, and supervision, Party to deal with, as the completion of plans and so on. XX in April so far in the construction of an electronic plant in the field of civil engineers (Party on-site representatives). I have been involved in the work for nearly 20 years, working in the construction field for many years, from the initial maintenance, building leakage to the supervision of high-level decoration, high-rise buildings, municipal roads, bridges and so can be described as experienced, , Project deputy manager, project director, project director and other duties. From the grass-roots level to the management to bear the heavy work pressure.
I am well aware that only with excellent professional skills, good communication skills and team spirit, in order to effectively carry out their work. At the same time I also use their spare time to actively improve themselves, completed undergraduate self (project management), also successfully passed the two construction division (housing construction, decoration) to test. I am eager to have more room for development in the new environment. Has also been in the Beijing Construction Engineering Group, the construction company for nearly 20 years, long-term engineering projects as chief engineer and project manager, which has served more than 20 million square meters of project total work, and more than 10 million square meters of project Manager, has a wealth of practical experience in construction. Work enthusiasm and initiative, with good interpersonal skills.
关于工程英文自我评价
The University is a place where I can really grow up. “The university not only taught me the real skills, but more importantly, taught me how to learn and how to look at things in the world in the right and unique way I think this is a better foundation for the creation of the world.
I really do what you like and is a good thing in the study, in addition to poor English, the other is very good, sophomore two semesters I am also familiar with the operation of office software. There autocad is also very familiar with (took a high card) .In addition to these ”business“, the amateur I still continue to enrich and improve themselves. A college radio station to do a director and then do vice minister of photography to do radio station deputy stationmaster, along the way I am in my ability to continue to climb in this process also learned a lot of knowledge, such as interpersonal, organizational management - - more importantly, I know what is the responsibility! I am very interested in literature and art, leisure time often as entertainment to study, so writing, sketches, photography, also have a certain ability to control.
I can not get a good car behind closed doors reason I know - the university I can seize all the opportunities to go out to social work.University summer school I organized a ”three rural“ reservoir safety research activities, experience in the heat Summer job I have seized the opportunity to do two ”summer internship“ - one for the Fan Yu a drafting company designed to do a month; Second, the Provincial Water Conservancy Research Institute to do Model construction. These work experience makes me more mature, ready to enter the community. Also, I personally although the body is smaller, but the physical condition is good. For the good and easy. I often give myself to wear such a top Hat: ”pragmatic idealist“! Because to achieve the ideal must be pragmatic.
Although my student life is about to end, but my learning career is like the responsibility of the construction project is a life-long system.
Through three years of college study and temper, so that they mastered a better learning methods, exercise their perseverance, and develop their own hard-working quality, for their own lifelong learning and laid the foundation. In addition, I study, work and overall quality has been greatly improved, so I understand the addition to learning outside the personal ability and the importance of the necessity of communication skills.
1. On the ideological and moral, I have a good moral cultivation, a firm political direction. So I pay attention to their own conduct, adhere to the self-reflection and strive to improve their own personality, so no matter what the circumstances, are the first to the moral requirements of their own, strict self-discipline, self-discipline and self-discipline, , Helpful.
In the study, I successfully completed the course, the completion of construction materials, the completion of settlement and accounting methods and Guanglianda software can skillfully operate, usually I also dabbled in a lot of literature, psychology and other extra-curricular knowledge. I believe in the future theory and practice which, can have a greater increase!
3. In the work, the work of enthusiasm, hard working, strong sense of responsibility, with good organizational communication skills, and colleagues united, pay attention to work with colleagues and leaders to do a good job, we have been unanimously praised.
In life, I advocate a simple life, and to develop good habits and decent style, can be very good to communicate with people, strong social adaptability, good at learning and accept new things, to Chikunailao,Positive and positive treatment of things and pressure, work on a proactive, serious and responsible. In addition, the concept of time attaches great importance. My life motto: There is no rehearsal of life, only live, so every thing should strive to do our best!
Three years of college, shaping a healthy, confident self, self-confidence from the strength, but also recognize that the rapid social change, the demand for talent is also growing, society is constantly changing, development, use Development to look at the problem, there are many shortcomings and deficiencies, to adapt to social development, must constantly improve their thinking, improve themselves and correct shortcomings, to learn to learn, learn to innovate and learn to adapt to social development requirements. I believe: efforts will certainly be able to win wonderful!
First, the construction quality inspection summary
1, February 17 to the company after the meeting will be completed in accordance with the requirements of the company to check the Shenzhen Vanke Qian Lin Shanju project, Guangzhou Conghua ia Wan to take the project to check the project technical documents, construction programs, construction quality, construction safety, The whole construction production system, the inspection of the quality problems, security risks, production points have been made to make a comprehensive reform measures and technical control methods, and check the eistence of the sub-project technical information reported to the company.
2, according to the eamination of the problems I have done the relevant rectification and technical disclosure, and technical delivery to the foreman under the hands of the Secretary, and cut the requirements of the main management personnel in accordance with relevant technical information to control the implementation of the project quality control in the implementation process Because the management system does not build the leadership does not attach great importance to the quality of the project, not at all levels of implementation, so the implementation of the original grid is not in accordance with the relevant technical specifications data implementation, there is no implementation of the reasons for the analysis;
A, in accordance with the current project construction in the quality, and safety issues to further analyze the quality of the project is the life, an enterprise should be quality first, safety first as the goal. First of all, the company's leadership on the quality of the project has not been a high degree of attention, the company did not develop a clear project quality management objectives, safety management objectives, there is no clear and feasible quality, safety control measures, and no uniform control objectives, A sub-project in the construction process will not be effectively controlled. B, the project quality management is the biggest flaw is not doing a good job targeted technical control of the book, senior management of the sub-project quality management objectives are not clear, security management is not clear, not to mention there are What to guide the effective control of technical documents, volatility and randomness are relatively large, according to the inspection results can reflect the pre-implementation process, sub-project construction is basically based on the discretion of the foreman to command operations, regardless of technical level , Not in accordance with the relevant regulatory requirements to make effective control of the relevant documents.
C, good technical disclosure is one of the conditions to effectively control the quality of the project, to this end, each sub-project should be carried out before the implementation of the end, operating technology, Program, is the process of construction of specific guidance documents, good technical first of all project managers should attach great importance to, and must be clear to the end of the content, including construction methods, quality requirements and acceptance criteria, the construction process should pay attention to issues that may arise Unepected problems and emergency measures. Key parts, or technical difficulties, the construction of comple sub-projects, do not do a good job at the end of technical sub-project, shall not enter the formal implementation.
Second, the production and quality management overview
1, the construction project is a production of a single, liquidity, large fluctuations, it is not like the general industrial products as the production line so standardized, a fied production lines, a standardized production technology and improve the detection technology, Of the production equipment and stable production environment, so the project quality is easy to produce fluctuations and fluctuations are still relatively large, while affecting the quality of the project is still more factors, any of which factors change, will make the project quality fluctuations. Such as the use of material specifications varieties of errors, improper construction methods, the operation did not follow procedures, mechanical equipment failure, design errors, the production system construction environment, and so will cause the project quality accident. A major factor is the human factor, according to my company is currently under construction projects, the eistence of quality problems, and the vast majority of security risks caused by human factors of quality and safety issues, the total summed up in five , Human factors, material factors, mechanical factors, construction methods, construction environment five factors.
2, personnel factors, people are the main production and operation activities, but also the construction of the project decision-makers, managers, operators, the whole process of project construction, such as project planning, decision-making, surveying, design and construction, To complete. The quality of personnel, that is, people's cultural level, technical level, decision-making ability, management ability, work ability, control ability, physical quality and professional ethics, will directly affect the quality of construction, so the personnel factor is an important impact on project quality factor. Therefore, it is necessary to strengthen the management of their own management quality, improve the quality and safety of management quality, first of all from the leadership to start from the leadership.
The University is a place where I can really grow up. ”The university not only taught me the real skills, but more importantly, taught me how to learn and how to look at things in the world in the right and unique way I think this is a better foundation for the creation of the world.
I really do what you like and is a good thing in the study, in addition to poor English, the other is very good, sophomore two semesters I am also familiar with the operation of office software. There autocad is also very familiar with (took a high card) .In addition to these “business”, the amateur I still continue to enrich and improve themselves. A college radio station to do a director and then do vice minister of photography to do radio station deputy stationmaster, along the way I am in my ability to continue to climb in this process also learned a lot of knowledge, such as interpersonal, organizational management - - more importantly, I know what is the responsibility! I am very interested in literature and art, leisure time often as entertainment to study, so writing, sketches, photography, also have a certain ability to control.
I can not get a good car behind closed doors reason I know - the university I can seize all the opportunities to go out to social work.University summer school I organized a “three rural” reservoir safety research activities, eperience in the heat Summer job I have seized the opportunity to do two “summer internship” - one for the Fan Yu a drafting company designed to do a month; Second, the Provincial Water Conservancy Research Institute to do Model construction. These work eperience makes me more mature, ready to enter the community. Also, I personally although the body is smaller, but the physical condition is good. For the good and easy. I often give myself to wear such a top Hat: “pragmatic idealist”! Because to achieve the ideal must be pragmatic.
Although my student life is about to end, but my learning career is like the responsibility of the construction project is a life-long system.
years to participate in the work to April has been in Beijing Construction Engineering Construction Engineering Company Limited, a project of any technical work. Mainly to participate in bidding, writing programs and to the end, drawing on-site construction plans, do negotiations, and supervision, Party to deal with, as the completion of plans and so on. in April so far in the construction of an electronic plant in the field of civil engineers (Party on-site representatives). I have been involved in the work for nearly 20 years, working in the construction field for many years, from the initial maintenance, building leakage to the supervision of high-level decoration, high-rise buildings, municipal roads, bridges and so can be described as eperienced, , Project deputy manager, project director, project director and other duties. From the grass-roots level to the management to bear the heavy work pressure.
I am well aware that only with ecellent professional skills, good communication skills and team spirit, in order to effectively carry out their work. At the same time I also use their spare time to actively improve themselves, completed undergraduate self (project management), also successfully passed the two construction division (housing construction, decoration) to test. I am eager to have more room for development in the new environment. Has also been in the Beijing Construction Engineering Group, the construction company for nearly 20 years, long-term engineering projects as chief engineer and project manager, which has served more than 20 million square meters of project total work, and more than 10 million square meters of project Manager, has a wealth of practical eperience in construction. Work enthusiasm and initiative, with good interpersonal skills.
有关工程英文自我评价
First, the construction quality inspection summary
1, ____ February 17 to the company after the meeting will be completed in accordance with the requirements of the company to check the Shenzhen Vanke Qian Lin Shanju project, Guangzhou Conghua __ia Wan to take the project to check the project technical documents, construction programs, construction quality, construction safety, The whole construction production system, the inspection of the quality problems, security risks, production points have been made to make a comprehensive reform measures and technical control methods, and check the e__istence of the sub-project technical information reported to the company.
2, according to the e__amination of the problems I have done the relevant rectification and technical disclosure, and technical delivery to the foreman under the hands of the Secretary, and cut the requirements of the main management personnel in accordance with relevant technical information to control the implementation of the project quality control in the implementation process Because the management system does not build the leadership does not attach great importance to the quality of the project, not at all levels of implementation, so the implementation of the original grid is not in accordance with the relevant technical specifications data implementation, there is no implementation of the reasons for the analysis;
A, in accordance with the current project construction in the quality, and safety issues to further analyze the quality of the project is the life, an enterprise should be quality first, safety first as the goal. First of all, the company's leadership on the quality of the project has not been a high degree of attention, the company did not develop a clear project quality management objectives, safety management objectives, there is no clear and feasible quality, safety control measures, and no uniform control objectives, A sub-project in the construction process will not be effectively controlled. B, the project quality management is the biggest flaw is not doing a good job targeted technical control of the book, senior management of the sub-project quality management objectives are not clear, security management is not clear, not to mention there are What to guide the effective control of technical documents, volatility and randomness are relatively large, according to the inspection results can reflect the pre-implementation process, sub-project construction is basically based on the discretion of the foreman to command operations, regardless of technical level , Not in accordance with the relevant regulatory requirements to make effective control of the relevant documents.
C, good technical disclosure is one of the conditions to effectively control the quality of the project, to this end, each sub-project should be carried out before the implementation of the end, operating technology, Program, is the process of construction of specific guidance documents, good technical first of all project managers should attach great importance to, and must be clear to the end of the content, including construction methods, quality requirements and acceptance criteria, the construction process should pay attention to issues that may arise Une__pected problems and emergency measures. Key parts, or technical difficulties, the construction of comple__ sub-projects, do not do a good job at the end of technical sub-project, shall not enter the formal implementation.
Second, the production and quality management overview
1, the construction project is a production of a single, liquidity, large fluctuations, it is not like the general industrial products as the production line so standardized, a fi__ed production lines, a standardized production technology and improve the detection technology, Of the production equipment and stable production environment, so the project quality is easy to produce fluctuations and fluctuations are still relatively large, while affecting the quality of the project is still more factors, any of which factors change, will make the project quality fluctuations. Such as the use of material specifications varieties of errors, improper construction methods, the operation did not follow procedures, mechanical equipment failure, design errors, the production system construction environment, and so will cause the project quality accident. A major factor is the human factor, according to my company is currently under construction projects, the e__istence of quality problems, and the vast majority of security risks caused by human factors of quality and safety issues, the total summed up in five , Human factors, material factors, mechanical factors, construction methods, construction environment five factors.
2, personnel factors, people are the main production and operation activities, but also the construction of the project decision-makers, managers, operators, the whole process of project construction, such as project planning, decision-making, surveying, design and construction, To complete. The quality of personnel, that is, people's cultural level, technical level, decision-making ability, management ability, work ability, control ability, physical quality and professional ethics, will directly affect the quality of construction, so the personnel factor is an important impact on project quality factor. Therefore, it is necessary to strengthen the management of their own management quality, improve the quality and safety of management quality, first of all from the leadership to start from the leadership.
工程英文自我评价范文
____ years to participate in the work to ____ April has been in Beijing Construction Engineering Construction Engineering Company Limited, a project of any technical work. Mainly to participate in bidding, writing programs and to the end, drawing on-site construction plans, do negotiations, and supervision, Party to deal with, as the completion of plans and so on. ____ in April so far in the construction of an electronic plant in the field of civil engineers (Party on-site representatives). I have been involved in the work for nearly 20 years, working in the construction field for many years, from the initial maintenance, building leakage to the supervision of high-level decoration, high-rise buildings, municipal roads, bridges and so can be described as e__perienced, , Project deputy manager, project director, project director and other duties. From the grass-roots level to the management to bear the heavy work pressure.
I am well aware that only with e__cellent professional skills, good communication skills and team spirit, in order to effectively carry out their work. At the same time I also use their spare time to actively improve themselves, completed undergraduate self (project management), also successfully passed the two construction division (housing construction, decoration) to test. I am eager to have more room for development in the new environment. Has also been in the Beijing Construction Engineering Group, the construction company for nearly 20 years, long-term engineering projects as chief engineer and project manager, which has served more than 20 million square meters of project total work, and more than 10 million square meters of project Manager, has a wealth of practical e__perience in construction. Work enthusiasm and initiative, with good interpersonal skills.
关于工程英文自我评价
The University is a place where I can really grow up. “The university not only taught me the real skills, but more importantly, taught me how to learn and how to look at things in the world in the right and unique way I think this is a better foundation for the creation of the world.
I really do what you like and is a good thing in the study, in addition to poor English, the other is very good, sophomore two semesters I am also familiar with the operation of office software. There autocad is also very familiar with (took a high card) .In addition to these ”business“, the amateur I still continue to enrich and improve themselves. A college radio station to do a director and then do vice minister of photography to do radio station deputy stationmaster, along the way I am in my ability to continue to climb in this process also learned a lot of knowledge, such as interpersonal, organizational management - - more importantly, I know what is the responsibility! I am very interested in literature and art, leisure time often as entertainment to study, so writing, sketches, photography, also have a certain ability to control.
I can not get a good car behind closed doors reason I know - the university I can seize all the opportunities to go out to social work.University summer school I organized a ”three rural“ reservoir safety research activities, e__perience in the heat Summer job I have seized the opportunity to do two ”summer internship“ - one for the Fan Yu a drafting company designed to do a month; Second, the Provincial Water Conservancy Research Institute to do Model construction. These work e__perience makes me more mature, ready to enter the community. Also, I personally although the body is smaller, but the physical condition is good. For the good and easy. I often give myself to wear such a top Hat: ”pragmatic idealist“! Because to achieve the ideal must be pragmatic.
Although my student life is about to end, but my learning career is like the responsibility of the construction project is a life-long system.
在校期间,我一直努力学习专业技能,并积极参加学校的各种实践实习。现已熟练掌握安全工程专业的各种专业技能,熟悉各种设备安全法律法规,各种设备安全监察与安全管理、评估,熟悉各种无损检测设备,对工件进行无损探伤检测的使用方法,以及ehs,oshms等认证体系的基本知识。
对工作认真负责,办事稳重,对事情把握得比较好。双重性格,会很好地控制自己的情绪。喜欢交际,能够很好地与同事,朋友和睦相处。喜欢运动、听歌、下象棋、看书。
喜欢挑战困难,自己的生活经历已经令自己深刻体会到如何在逆境中生存,在最短的时间内找到适合自己的最佳生存方式。在团队活动中,善于起领导作用,激励同伴发挥自己的特长和能力,为共同的目标努力。
作为一名合格的公司员工,我十分清楚自己什么时候应该做什么,怎样为自己的企业带来更好的收益。
First, we must have a good grasp of the basic theoretical knowledge Our internship is the root of the smooth success of our basic theoretical knowledge, our group of students learning achievement are good, usually more serious study, boys and girls are the first In our group, it is really great. Other students are also great, the use of the instrument is very correct and skilled, particularly serious about digital processing, and in strict accordance with the basic provisions, such as ”the scope of the error limit, from the whole to the local, from the control to the Department of broken“ and so on. In short, we usually work hard to learn is the basic guarantee for the smooth conduct of the internship.
Second, we must have the spirit of innovation, although we usually feel good learning, but to the hands-on practice, we began to really eat a little bit of the tiger - no way to start. However, we dare to practice, the courage to explore, the courage to innovate, and finally, we completed a copy of a homework. And our internship report miraculously from scratch, from less to more, from simple to complex and then complete, and ultimately become a perfect answer. I am proud of our spirit of being able to practice and be innovative. In the future work should make good use of this wealth!
Third, there must be realistic and pragmatic spirit In the first two days of measurement practice, we in order to speed up the progress of the work are very fast, there is no timely processing of data, the results to distance data, we found that we Of the data can not be used, however, we did not relax themselves, we all agreed to re-do, after repeated measurements, we finally got a reasonable data, pay a satisfactory job. I think we engaged in the structure of the people not only in the measurement must have the spirit of seeking truth and being pragmatic, engaged in any work should have the spirit of seeking truth and being pragmatic. The only way to do a qualified construction industry talent.
Fourth, the failure is the mother of success, practice makes perfect After a time of error, again and again retest, a second calculation, the operation of our instruments have been further improved, the speed of measurement is also faster and faster, accurate data Sex is getting higher and higher. This also thanks to a second failure, again and again to rally, time and again to practice. At the same time, failure also honed our will, the more rub Yong Yue.
5, the unity of the group - criticism - re-unity is very important group to give full play to the xxxxxx, but also the implementation of the xxxxxx above the concentration. A person is not a panacea, depends on everyone, a person's knowledge can not be comprehensive, rely on the collective, a person is wrong is not terrible, to dare to expose errors in front of everyone to accept criticism. In the ongoing debate, we can find the problem, study the problem, solve the problem, the formation of the group the most correct views. This should be called on the basis of unity to dare to criticize, but also to work together for the purpose of it! Of course, the group's ”unity and mutual assistance“ would not have said it.
Six, the teacher's guidance is very important In practice, we inevitably have some problems can not be solved, then, thanks to Chen, Wang careful and patient guidance, we only enlightened, thinking and more open. We have such achievements first of all to thank our instructors - Chen and Wang.
Work skills and other expertise
I am serious and responsible, easy to communicate with people, have a strong sense of responsibility and teamwork; have strong organizational coordination, frank, confident, optimistic, calm, good interpersonal relations, with a certain sense of innovation and creativity Ability to learn and accept new knowledge, strong ability to accept the organization at any time, there are hardship to admit defeat the spirit. Familiar with word, excel, ppt and other office software and CAD drawing software.
Self-evaluation
In the course of several years of work, can be the company's leadership and colleagues agree and endorsement, but also for their training a certain degree of work experience and ability. So I become more mature, more positive self-confidence, but also I deeply appreciate the communication and coordination and team work and work execution in the work of the importance. I like to continue to challenge difficult problems, do not understand things to make it understand understand. Into the enterprise, I will make every effort to do their own work, at work to achieve good results.I believe that through their own hard work and efforts, will be given due results. I hope that the new work will make me in life and work have greater progress and better development!
Note: The insurance and financial industries do not disturb, thank you.
1, the construction project is a production of a single, liquidity, large fluctuations, it is not like the general industrial products as the production line so standardized, a fixed production lines, a standardized production technology and improve the detection technology, Of the production equipment and stable production environment, so the project quality is easy to produce fluctuations and fluctuations are still relatively large, while affecting the quality of the project is still more factors, any of which factors change, will make the project quality fluctuations. Such as the use of material specifications varieties of errors, improper construction methods, the operation did not follow procedures, mechanical equipment failure, design errors, the production system construction environment, and so will cause the project quality accident. A major factor is the human factor, according to my company is currently under construction projects, the existence of quality problems, and the vast majority of security risks caused by human factors of quality and safety issues, the total summed up in five , Human factors, material factors, mechanical factors, construction methods, construction environment five factors.
2, personnel factors, people are the main production and operation activities, but also the construction of the project decision-makers, managers, operators, the whole process of project construction, such as project planning, decision-making, surveying, design and construction, To complete. The quality of personnel, that is, people's cultural level, technical level, decision-making ability, management ability, work ability, control ability, physical quality and professional ethics, will directly affect the quality of construction, so the personnel factor is an important impact on project quality factor. Therefore, it is necessary to strengthen the management of their own management quality, improve the quality and safety of management quality, first of all from the leadership to start from the leadership.
Four years of college life full and tense, I strive to train themselves into a society needed talent. Our engineering management major is to cultivate the basic knowledge of management science, economics and civil engineering technology, master the theory, method and means of modern management science, and can be engaged in project decision-making and the whole process management in the field of domestic and foreign projects. Management talent. Learning:
I have been trained in engineering, management, economics, law, foreign languages and computer applications with the basic quality training of engineers and economists. Project management professional and national registered supervision engineer, the national registered cost engineer knowledge structure, professional direction covers engineering project management, real estate management, engineering investment and cost management, international engineering contracting direction.We can be engaged in engineering consulting, project construction, real estate development and management related work, professional coverage, wide range of practitioners, social needs.
This four-year study makes me realize the mystery of knowledge. I am not satisfied with the status quo, and constantly challenge themselves, successfully passed the English four or six examinations, and won the first class scholarship.
Social practice: the spirit of learning in practice, the theory of combining practice, in the summer of XX, I internship in the construction unit, by doing the work of construction workers, I am more deeply aware that we must put into the community of the University of their own Will really grow up, I will try to focus on the future study and life in these areas to improve the capacity to strive to do all aspects of the new quality of talent.
Knowledge and ability to master:
1. Master the basic theory and methods of project management;
2. master the basic theory and basic knowledge of investment economy;
3. Familiar with civil engineering technical knowledge;
4. Familiar with the principles, policies and regulations of the project construction;
5. Understand the development of engineering management at home and abroad;
6. With the use of computer-aided management problem solving ability.
My advantage is honesty, enthusiasm, character perseverance. I believe that integrity is the conduct of the country, so I have been a must-do to ask their own, and promised to do some things on time, which left others a deep impression. In learning the knowledge, I know better, consider the problem should be thoughtful, which in dealing with interpersonal relationships when I fully demonstrated. I have a characteristic of this person, that is, do not like anticlimactic, things have always been beginning and end, even if the matter is also hard to go all out, the pursuit of the best results.
Project management professional employment areas involved in construction, construction and control management, real estate management and finance, hotels, trade and other sectors of the management. This profession involves a large demand for talent in the field of employment is relatively common. From bank securities to hotels, from construction companies to real estate development companies are anxious to add a large number of projects to create management and related professional personnel, the talent market demand for the professionals. The major areas of employment involved are: the integrated use of basic knowledge of management, construction, economy, law, focusing on engineering construction, construction management and real estate development, and familiar with China's related policies, policies and regulations, conduct The Management and Operation of Enterprise Engineering Development and Construction Project
Through this four-year study career so I know a lot, from that innocent child I, through that life's setbacks and ups and downs, and now mature, stable me. So I understand a truth, life can not exist smooth sailing things, only their courage to face life in every post. Of course, the results have become the past, the future belongs to themselves.
Ideology, the pursuit of advanced, pragmatic, willing to forge ahead, positive and progressive. In the school as a student cadre during the strict demands on themselves, a serious and responsible, helpful, and actively carry out student activities, enrich students life between classes, and consciously assist the class cadre, the Department of cadres planning, organizing various sports activities, have a certain ability and The enthusiasm to participate in the work. In many activities by the teacher's recognition and the recognition of students. Learning, love of professional, good grades, practical experience. I take the initiative to put into practice, and actively participate in social practice. In the work from the unfamiliar to the familiar, from a loss to be handy. On this basis, gained a lot of practical experience, establish a strong sense of responsibility, dedication, improve their language, communication, organization, work ability and the Aspects of quality. For the future in the real position of the work to establish a solid foundation, provides a strong backing.
Life, cheerful, generous, like with people, style, practical and helpful.Often participate in the activities carried out in the department, and in the activities of positive, upward, strict demands on themselves, and many times in the hospital, department, class style competition with students to achieve outstanding results.
Five years of college life, constantly enrich themselves, to enhance their own but also accurate and timely understanding of their own shortcomings and shortcomings, but I believe the future of learning life, in the practice of tempering, will avoid weaknesses, continuous improvement, Constantly improve and grow!
Since entering the university strict demands on themselves, and consciously study, and actively participate in the practice of various sports, and enhance individual comprehensive ability and all aspects of quality.
Ideology, the pursuit of advanced, pragmatic, willing to forge ahead, positive and progressive. In the school as a student cadre during the strict demands on themselves, a serious and responsible, helpful, and actively carry out student activities, enrich students life between classes, and consciously assist the class cadre, the Department of cadres planning, organizing various sports activities, have a certain ability and The enthusiasm to participate in the work. In many activities by the teacher's recognition and the recognition of students. Learning, love of professional, good grades, practical experience. I take the initiative to put into practice, and actively participate in social practice. In the work from the unfamiliar to the familiar, from a loss to be handy. On this basis, gained a lot of practical experience, establish a strong sense of responsibility, dedication, improve their language, communication, organization, work ability and the Aspects of quality. For the future in the real position of the work to establish a solid foundation, provides a strong backing.
Life, cheerful, generous, like with people, style, practical and helpful.Often participate in the activities carried out in the department, and in the activities of positive, upward, strict demands on themselves, and many times in the hospital, department, class style competition with students to achieve outstanding results.
Five years of college life, constantly enrich themselves, to enhance their own but also accurate and timely understanding of their own shortcomings and shortcomings, but I believe the future of learning life, in the practice of tempering, will avoid weaknesses, continuous improvement, Constantly improve and grow!
◆ Achievements
Our company development and production of hook-tail box, on the heart plate, support blocks and other new railway products, transferred from June
QC department after the initiative to help guide the leadership of new product debugging and production, will know and in the work should focus on the issues and front-line employees one by one detailed, auxiliary production work smoothly. In the independent sent to the machine shop, the timely and timely follow up the progress of each new product processing and the establishment of accounting, so that each new product from the machine into the workshop to start the process, each step real-time monitoring. Timely detection and feedback of new products in the process of the existing problems and to assist the technology sector to improve the processing technology. And ensure the successful completion of mechanical processing of sample samples for crcc certification of ”Forged steel upper plate for railway wagons“, ”13b forged coupler end frame“ and ”17 forged hooktail frame“.
◆ personal strengths and weaknesses
I learned mechanical manufacturing, and previously engaged in Haier is mainly automated robotic aspects of testing, came after the company has only been working in the machine shop, the knowledge of the relatively lack of forging. When I first came to the QC department of the forging workshop, I almost did not know the company's forging products. After consulting with my colleagues, I quickly learned about the performance and key points of each product. . I am from the machine plus apprentices began to come step by step, mechanical processing, programming knowledge more solid. In the machine after the workshop, not only to ensure that machine products and timely detection, and can be found in the process of the hidden dangers, to avoid the occurrence of quality accidents, auxiliary site production.
◆ personal development goals in the company
Quality inspection work is not a simple size detection. At present our departments involved: forging detection, machining finished product testing, tensile, impact test, metallographic test, hardness, magnetic detection, ultrasonic testing. Debugging products related to bridge bearings, construction machinery, coal mining machinery, truck parts, etc., processes heating, forging, roll forging, heat treatment, machining, etc., these things are the wealth of the hands of the company in the detection sector is not To so many things. In future work, I will, as always, people: people with good, the work: to perfect, the quality: strict hold. And constantly strive to learn and expand their knowledge, assiduously enhance their business level to look forward to the development of the company to do their part.
◆ recommendations for the company
Attention to detail, emotional trivia in life to increase points, in principle, equality and discrimination on the issue of everyone, improve employee sense of belonging and well-being, to retain talent to create a win-win situation. I listed below a few examples of Qingdao Haier Mold Co., Ltd.: employee birthday, wedding anniversary, the birthday of the children and other commemorative date, timely delivery of small gifts or leave, pull the distance between the company and employees to improve the staff members of the family Satisfaction and Support.
Old workers are generally a living textbook of the industry, retain veterans to retain wealth. Haier in the work of the old staff will be awarded over a decade gold medal or silver horse, issued over twenty years of work Kinmen and Matsu.
Each pay to the form of e-mail to employees of personal wage details sent to the mailbox, and require confidentiality. Not only to avoid the wage detail unified postings brought about by the asymmetry between employees, infighting and other situations, improve employee well-being, help the team cohesion of the upgrade. But also allow each employee has a clear understanding of their own accounts, be aware of, personal experience to pay to reward power.
But on the issue of principle pay attention to equality, equality for all, ”Haier high-voltage line" of good faith as an example. To get off work (instead of) playing time card, without a license to take the bus (Haier employees can travel in the bus and bus subsidies between the two elections) and other acts, regardless of the level of job once found unconditional termination of labor contracts, exception.
Since 2011 came to the sea company, joined the Department of Quality Assurance, as a quality inspector, I know the importance of this post, so I do a solid job in their own work, in strict accordance with company standards test products, good quality, will Unqualified product control in the workshop, although the work will encounter many setbacks but I believe I can overcome and seek new ways to solve. From three aspects of my work to be summed up:
First, the duties:
1. Responsible for the production workshop of the product sampling, so that the quality of products in line with the corresponding standards;
2. Obey the distribution, obey the command, and strictly abide by the company's rules and regulations and the relevant provisions;
3. Responsible for the company's products to keep the kind of test, constant temperature test, record the results of experimental products, timely reporting.
4. Daily check transcripts and work records, monthly summary of work and make a work analysis, and into the improvement measures. 5. In the work which must be impartial law enforcement, non-discriminatory to the law has been, lead by example.
Second, the work attitude:
1. love their jobs, work conscientiously, there are not afraid of tired of the spirit of fear, there is willing to be an unsung heroism. To act fair, loyal to their duties and work hard to master the skills. Be serious and responsible to the work, good at communication, coordination, failing to actively seek solutions;
2. To have a strong organizational skills and team spirit;
3. Lively and cheerful, optimistic motivated, caring and good at teaching and learning in parallel;
4. To be motivated, diligent in learning to continuously improve their own ability and overall quality. With plenty of energy, assiduously study the spirit to work hard and steadily improve their ability to work with the simultaneous development of enterprises.
Third, the performance:
1. In the workshop production process, the product label color part of the wrong version, timely listing, and notify the manager to view, will be unqualified products under control, reduce company losses. Therefore, strict control of product quality, increase sampling ratio, reduce defective produce. Is my job as a quality inspector.
2. The company held a speech contest, I am active use of spare time to collect materials, continue to read the content, learning speech skills, won the honor for the department.
2. The product to keep the kind of test, constant temperature test, check every day, the quality problems arise, to timely report to the manager and corrective measures, shall not conceal the facts and intentionally not reported.
3. To complete their own work, learning test knowledge, applied to the work, to help others solve what they can.
4. Strict implementation of the relevant provisions of the qualified system, on time to complete the quality inspection and check work, timely completion of the original report of the sorting, archiving.
Looking back at the past, although there are some gratifying achievements, but also found that there are many problems in their own work, sometimes pioneering and innovative awareness is not enough, but they are always seeking stability and fear, in some issues handled look after. I will seriously sum up experience, carry forward the results, overcome the shortcomings, to further strengthen the theoretical study and work practice, and constantly improve their ability to work. Society in progress, the company in development, I will continue to learn through the improvement of their own, for the company to develop their own modest.
★ 英文自我评价
★ 自我评价英文